
/
/
COBOD BOD2 3D construction printer
With its high flexibility, fast printing speed and ease of use, the BOD2 is the best 3D printer for your construction projects.
The heart of our holistic 3D printing solution is the COBOD BOD2 3D printer. The modular gantry printer is quickly assembled around the printing area and moves its print head along three axes to build the building walls. Its modular configurability gives you flexibility in every project and allows you to easily expand your printer for larger projects. Once calibrated, the BOD2 prints one square meter of cavity wall in just five minutes. The complete printing system by PERI 3D Construction also includes the necessary silo mixing pump and a silo. We also offer comprehensive training on the machine and support with the planning and approval processes. The BOD2 is produced by the Danish manufacturer COBOD. As a key shareholder of COBOD, the BOD2 can be purchased exclusively through us.
APPLICATION
Automated.
Through automation, construction companies can increase productivity on the construction site and position themselves for the future. 3D printing reduces physical labor on construction sites and helps implement projects quickly and efficiently.
CONFIGURATION
Flexible.
Thanks to its modular design, the BOD2 3D printer can be tailored precisely to the needs of your projects. Additional rental modules allow for easy and flexible expansion.
CONSTRUCTION
Future-proof.
The technology surrounding the BOD2 is continuously being developed and can be easily upgraded. This makes the BOD2 a long-term investment.
APPLICATIONS AT A GLANCE
COBOD BOD2 3D construction printer in use
The BOD2 print head moves along three axes within the gantry system that is built around the building to be printed.
Depending on the configuration, the printer can be set up in just one to two days. Once calibrated, the printer can operate automatically throughout the entire project.


With just two or three workers, the BOD2 can erect entire buildings. The printer handles most of the physical work, while the workers monitor the processes and intervene when necessary.
The BOD2's nozzle rotates during the printing process, allowing layers to be automatically smoothed if desired. A wide selection of nozzles allows for full flexibility in terms of layer height, layer width, and surface finish.


The building to be printed is planned in detail in advance. All trades are taken into account to ensure an efficient construction process. 3D printing also allows architects enormous design freedom.
The complete know-how required, from planning to using the BOD2 on the construction site, is imparted in several training courses to quickly and thoroughly prepare teams for their first projects.

Product data sheet
Technical data
Printing system
Modular configurable portal system
Maximum building size with largest configuration
13.5m wide
9m height
Virtually unlimited length
Additional modules can be rented via PERI 3D Construction
Yes
Matching silo and mixing pump included with purchase
Yes
Availability for purchase via PERI 3D Construction
In Germany, Austria, Switzerland, France and Poland
Application
Print speed
Up to 1m/s
To allow for manual work in the printing area up to 25cm/s
Example printing time for 1 square meter of cavity wall
5 minutes
Printing material
Open to any material, usable with any 3D printable building material up to 10mm grain size
Print layers
Layer heights: 1cm - 4cm
Layer widths 3cm - 10cm
Rotatable nozzle / tangential control
Yes
Automatic smoothing possible
Yes
Camera monitoring of the printing process and the results
Yes, optional
Supported data formats for slicers
All conventional CAD formats such as .STP, .IGS, .BREP and .OCC
Various print nozzles available
Yes, numerous nozzles for different layer dimensions and surface finishes possible
Construction and assembly
Setup and dismantling time
Depending on the configuration used, a printer for multi-family buildings (13.5m x 17m x 9m) takes about 1.5-2 days.
Foundation
Screwing to the floor slab or concrete blocks
Assembly service available through PERI 3D Construction
Yes
Security technology
CE-certified, IP67-certified cabling, galvanized steel cables
EVERYTHING FOR A SMOOTH START – AND FAR BEYOND
Suitable products for the COBOD BOD2 3D construction printer

EVERYTHING FOR A SMOOTH START – AND FAR BEYOND